Sorry I've fallen behind with my updates on our work progress.  Friday and Saturday were busy days for us getting work done on the shed/Cameron's room and around the house and yard. Now that the trenching and laying water, sewer and electric lines are done the interior work has begun.  The water lines are laid out for the shower and sink.  The electric lines and outlets are in place.

Wiring going up for the electric and Patrick is installing the water lines for the shower.

Cameron's shower in a box
Insulation and wiring

The vent and light combo are installed for the bathroom area and the exterior light that matches the one by the front door is up.

Vent fan and light box in place inside

Exterior view of vent
Kevin installing exterior light

Today the drywall has begun to go up and as I type this post they are about 3/4 of the way finished with all of this, including the waterproof backing for behind the shower stall area.

Shower backer board and drywall going up


The three guys, Kevin, Patrick and Cameron are really making headway on this in a
 truly impressive manor.  At this rate Cameron's going to be enjoying his room within a short period of time.  It's pouring rain right now, but they are completely dry inside their workspace so it's not slowing them down.

 

 

This past weekend the girls continued to work on their bike riding skills while I got more plants in the ground and mulch to cover them as I did so.  After working on Saturday we finished our day by taking food to be grilled over at Pat and Jen's where Grandma was able to join us for the steaks, baked potatoes, corn on the cob and salad.  Sunday with the exception of  Kevin and Patrick making a run to Lowes to stock up on needed building materials we relaxed after church and planned to start early today.  It's fun to see this coming together and as it does to begin to plan for flooring and paint color.  Will continue to post as we make progress.